Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the foogallery domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/p3766iqc7kps/public_html/wp-includes/functions.php on line 6114
Malt Group | Building in maintenance

Pearl Series Machines

Pearl Series Machines are parapet mounted Building Maintenance Unit (BMU), it is recommended where the roof space is insufficient or the roof is not able to bear the load of the machine or the parapet height is more, the traversing is along the double rail track mounted on the back of parapet wall, the roof machine will include steel chassis, structure and frame, the jib, the slewing mechanism, the spreader bar slewing mechanism.

Hoisting Option:

  1. The hoist is within the working cradle, it is a basic system with the advantage of using the same power cradle with other systems be it a machine, monorail or davit by easy switching.

Traversing Option:

  1. Parapet mounted double steel track on steel bracket connected to parapet by steel anchors.

Function:

  • Luffing of jib by hydraulic jacks
  • Spreader bar to keep cradle parallel to façade (motorized/manual)
  • Motorized machine slewing
  • Complete Control are given in machine and cradle

Standard Dimension:

Application Height : up to 250 meters
Jib length: 2500 – 4500 mm
Cradle length: 2 – 3 meters
Safe working load: 240 kg

Safety:

  • Emergency stop
  • Electromagnetic brake in the hoist with secondary mechanical brakes
  • Upper limit safety device
  • Lower limit safety device
  • Emergency manually controlled descent
  • Thermal overload safety for cradle
  • Slack wire ropes safety device
  • Anti – collision bar